Switchgear Replacement
Replacement switchgear carried out at a glass manufacturing plant. Job included disconnection and removal of all circuits, removal and disposal of old switchgear, disconnection and removal of 3 x incoming supplies, positioning and securing of the new distribution switchgear, extension of 1 of the 240mm 4 core supply cables, extension of multiple circuits via means of a new purpose built junction box, new containment to tidy up cables and create easy access routes into the board for future installations, connection of all outgoing circuits, testing of all incoming and outgoing circuits, commissioning and power up.

Old LT Board Before Removal

Old LT Board During Removal

New Switchgear Installed

Old LT Board Before Removal
1/5